The installation of cable in accessible.
Nec wires in attic.
The staple gun should be loaded with wire staples designed for holding the size and type of wire you are running.
Raul no this is not a standard practice and is most likely the result of improper installation of electrical attic wiring.
Snip all the white neutral wires to the same length 6 in.
You will need access to nec tables for the following instructions.
National electrical code nec section 310 10 requires conductor derating in two situations.
The same basic national electric code or nec rules apply.
The national electric code has another definition for damp locations that is more subjective but if you think the receptacle is going to get wet use an in use.
Fold the ground wires neatly into the back of the box photo 11.
While one person holds the flashlight the other person should use a staple gun to run the wire along the rafters from one entry hole to the other.
The attic wiring should be protected and secured to ceiling joists or other wood structural supports.
Is it safe to leave live wires capped in switch box covered by flat plate.
Installing a j box in the attic is easiest if the attic is unfinished and used for nothing more than storage.
Nec 334 23 in accessible attics.
Push the long wire through the hole in the top of the special green wire connector and connect the remaining wires to it by twisting the connector clockwise until it s tight.
Bring all of the wire up into the attic.
When the ambient temperature rises above 30 degrees celsius and when you are bundling more than three wires in a conduit or cable.
The national electrical code defines a wet location as an area that is subject to saturation with water or other liquids and unprotected locations exposed to the weather.
Video of the day volume 0.
Yes this should be corrected and it would be good to have the wiring and all the circuit connections inspected as well.